USCG Margaret Norvell
Project Scope:
This project focused on preserving and restoring the weatherdeck non-skid surfaces on the 01 deck, of the USCG Margaret Norvell, following detailed specifications. Non-skid surfaces are essential for ensuring safety and functionality in high-traffic areas exposed to harsh environmental conditions.
Services Performed:
-
Surface Preparation:
-
Comprehensive abrasive blasting was conducted to achieve a high standard of surface cleanliness and profile, ensuring proper adhesion for the coatings.
-
Detailed inspections were performed throughout the process to verify surface readiness for coating application.
-
-
Coating Application:
-
A protective primer was applied to create a strong, durable base layer, resistant to corrosion and wear.
-
A custom non-skid coating system was installed, tailored to meet the specified safety and durability requirements.
-
The system was sealed with a protective topcoat designed to enhance longevity and environmental resistance.
-
Challenges Overcome:
-
Careful planning and execution minimized disruptions to ongoing operations.
-
Adverse weather conditions were managed effectively to maintain project progress and quality standards.
Outcome:
The restored weatherdeck now features a durable, slip-resistant surface that enhances safety and operational reliability. The project was completed with full compliance to specifications, delivering a high-performance solution built to withstand demanding conditions.
4o